About us. 

Our Vision.

 

To achieve a reputation for excellence unmatched in the mechanical construction industry.

Core Values

We value - Safety, Ethics, Ajim team members, Superior client service, Quality, Passion and initiative

Mission Statement

The mission of AJIM ENTERPRISES LIMITED is to provide  superior quality general engineering construction works and services that are contracted, scheduled, engineered to create maximum value for our customer, owners, employees, and communities

Objectives

To provide high quality, services to stakeholders and the general public aimed at achieving national goals. The company is highly committed to health and safety requirements with environmental green attitude.

LEGAL STATUS OF THE COMPANY


AJIM ENTERPRISES LTD Incorporated in Tanzania Mainland as a Limited Liability Company on 15th April 2005 with Registration number 52174.

VAT No 10-018078-M
TIN No 103-585-945
Business licence of mechanical No B01019831
Hardware business licence No 3
Mechanical Contractor CLASS FOUR
CRB Mechanical Work Contractor Reg No M4/0011/7/09
CRB Scaffolding  Contractor reg NoSPB3/0261/12/5
OSHA certificate number Dar/002.123

HUMAN RESOURCE CONTROL
Company employes qualified staff to meet challenges

 

TOOLS, MACHINERY AND EQUIPMENT

The company has sophisticate equipment for execution of scaffolding and mechanical work projects ANTI-BRIBERY COMMITMENT
Our company shall not be engaged in any acts of bribery or corrupt practices in whatever form.

 

PROJECTS EXECUTED   BY THE COMPANY
The company has been fully engaged in complicated and sensitive projects particularly in Cement industries.

COMPANY INSURANCE POLICY
The company has the policy which ensures the projects worth of Shs 50 millions and above.

SAFETY AND HEALTH POLICY.
The company has its safety policy to ensure that health and safety is in accordance of OSHA regulations are adhered to, and continued trainings are emphasized in:-

·         Electrical power, machines and instruments

·         Fuels and oils

·         High pressure and Gases

·         Work permit, work at Height, HOT permit and lockout etc.

·         Confined working areas procedures are adhered e.g. Silos , cyclones, inflammable tanks etc

                        Safety and Health objectives

Ajim Enterprises Ltd Plans to achieve workers safety and health through the following;-

a)      Using qualified safety personnel.

b)      Making regular site safety inspection.

c)      Enforcing the use of safety personal protective gears

d)      Following safety procedures and rules

e)      Providing on-going safety training.

f)        Enforcing safety rules and using appropriate discipline.

The company treats safety with great emphasize,the company have trained its staff to insure safety procedures are followed . This has been proved during execution of works with LAFARGE CEMENT PLANT without any accident.

     

Safety Rules

All of our safety rules must be obeyed; failure to do so will result in strict disciplinary action.

1)  Keep your mind on your work at all times. No horseplay on the job

2)  Personal protective gears must be worn per risk assessment such as goggles, gloves and helmet etc.

3)  Avoid spilling oil on working floors

4)  You are not allowed to work under influence of alcohol or drugs

5)  Use HOT per permit when working in hot areas exposed to explosion

6)  Lift heavy goods on your legs not on your back

7)  Do not start the machine which you can not stop

8)  Make sure that all machine guards are in place after repairs

9)  Fill in work permit before starting any job, make sure that all machines are isolated from power

10)  Make sure that all trenches are covered in working places

11)  Build scaffolds according to manufactures, recommendations and OSHA Construction Standard for –  Scaffolding

12)  The use of harnesses with safety lines when working from unprotected High places is mandatory

13)  Open fires are prohibited

14)  Never enter in confined working place without approval of authorized person.

15)   Harnesses and lanyards shall be utilized for protection as required in OSHA and CRB Construction safety standards

 
Safety Discipline

The company will discipline any employee or partner violating rules as stated bellow (A-C)

A.     Three-step System

First violation                     -          Written warning; Copies to employee and employees file

 Second violation               -          Written warning; suspension half or full day without pay

 Third violation                  -           written report for file and immediate termination.

 

B.    Four-Step System      

       First violation  -  Oral warning; notation for personnel Office

       Second violation - Written warning; copy for file or personnel Office.

 Third violation   -   Written warning; one day suspension without pay

 Fourth violation  -  Written warning; and one-week suspension or Termination.

C.    A record disciplinary actions will be maintained in employees personal files.


EMERGENCY PROCEDURES

In case of emergency the company has introduced the following procedures;

1.       Method of communication at the site

2.       Emergency telephone numbers will be  displayed as follows

  • Police

  • Fire brigade

  • Medical Response Team etc.           

ENVIRONMENTS

Ajim Enterprises recognizes mechanical operations if not done with an environmental preservation, will result into affecting the environment. Further the company recognizes that good management includes all environmental matters and gives high priority to the prevention of pollution to water, air and land.

Therefore, the company will comply with applicable laws and regulations and will implement programs and procedures to ensure Compliance with environment as well as healthily and safety will be a key ingredient in the training, performance review, and incentive of all employees.

NB: These rules are extracted from the main company’s profile

Company Profile.

 

LEGAL STATUS OF THE corporation REGISTRATION

AJIM ENTERPRISES LTD Was Incorporated in Tanzania Mainland as a Limited Liability Company on 15th April 2005 with Registration number 52174   

                

ANTI-BRIBERY COMMITMENT

Our company shall not be engaged in any acts of bribery or corrupt practices in whatever form.

PROJECTS EXECUTED BY THE COMPANY (COMPANY EXPERIENCE

During these years of our operation we are competent and experienced in the following fields.

SUPPLY OF BUILDING MATERIALS (HARDWARE MATERIALS

We have experience in supplying building materials over ten years as follows;

Steel materials; Plain sheet, chequared plates, Pipes, Hollow section.

Round bars, Stainless materials, Pipes connections, H beams,

U channels, etc.

Welding materials; Welding cables, Electrode holders, Aprons,

Welding electrodes, Gas cutting torches, Nozzles, Back fire arrestors, Gas gauges, Welding shields, etc.

Safety gear materials (PPE) From SOUTH AFRICA. Uniforms, Goggles, Boots, Gloves, Masks, Helmets, Aprons, Muffs, Harness etc.

         

Other hard ware materials; Also we are dealers in general supplies.                                                                                                                                                                                                                                   

Within this period to date we are supplying, Mbeya cement Company, Tanzania Cigarette Company Ltd, Coca cola kwanza Ltd, Wakulima tea Company Ltd, Mbeya Institute of Science & Technology, VETA Mbeya, Mbeya City, SIDO Mbeya, SUMA JKT, TAZARA, JWTZ NGERENGERE AIR WING,  Individuals Etc.

TECHNICAL EXPERIENCE

CRUSHING SYSTEM (CRUSHERS)

We have experience in overhauling Limestone, Sand stone, Coal and aggregate crushers.

Dismantling and installation of sprockets and gears.

Dismantling and installation of idlers, bushes and fly wheels.

Adjustment, alignment and balancing crushers.

Dismantling and installing of lamellae conveyor.

Alignment of gear box and motors.

GEAR BOXES, MOTORS, FLY WHEELS, SHAFTS AND COUPLINGS;

We are experience in mounting and aligning the above mentioned drives.

We are experience in dismantling and assembling the drives on shafts and motors

NEW CEMENT PACKER                      

          “ Installation of new cement packer and alignment.

          “ Fabrication and installation of packer accessories.

          “ Fabrication and installation of packer silo.

           “Fabrication of packer weighing mechanism.

 

MILLS  

Converting Cement mill from three chambers to two by dismantling all liners, diaphragms. Drilling new holes on mill for liners and diaphragm mounting.  And re installing.

Repairs – Dismantling old shell liners, Diaphragm liners and Diaphragms  and re installation of new liners and diaphragms in the mills.

Cleaning caked materials in duct pipes (in cement pipe lines)

Repair of cement fluxo and pipe lines.

Installation of fluxo air pressure tank and pipe lines.

KILNS

Fabrication and installation of new kiln cooler tube.

Repair and installation of liners in cooler tubes.

Making and installation of bricks stop ring in kiln.

Development and installation of kiln outlet cone.

Anchoring and shuttering in kiln arch, cone and cooler tube mouth.  

 

PETROLEUM AND FUEL INDUSTRIES/INDUSTRIAL PIPES.

Fabrication and election of vertical/horizontal fuel tanks, Pipe lines, Gantries, Canopies and Steel duct pipes and Structures.

Installation of pumps and overhauling including fuel pumps.

 

SILOS

Cement silos, Coal silos, Limestone and sand stone silos

Clearing caked materials in silos

Erecting and dismantling of scaffold in silos

Installation of liners in limestone silo

Fabrication and installation of cement packers storage silo.

 

CYCLONES FOR KILN, RAW MILL

Installation of deep tube in cyclones

Erection and dismantling of scaffold in cyclones, silos, kiln and underground.

Scaffolding during building construction.

Repair of raw mill cyclone housing on top of raw mill SILO.

Fabrication and installation of cyclone roof.

Anchoring and shuttering in cyclone ready for casting

Installation and blockage blasters in cyclones

Erection and dismantling of scaffolds in cyclone

FANS & BLOWES

Repair of fan housing and blades for raw mill and Coal mill.

Fabrication, installation and alignment of blowers.

Casting blower foundations, Instillation of blowers and alignment.

CONVEYORS

Fabrication and installation of conveyor structure.

Installation and alignment of conveyors.

Installation of bucket and box conveyors.

Fabrication and installation of air slides.

 

ROOFING WORKS

Roofing of go downs and fuel station companies

Industries structuring and roofing.

TOWERS

Fabrication and installation of towers

SAND BLASTING AND PAINTING SERVICES

 eg ;- Vertical tanks, Horizontal and Underground tanks

-         Pipes; Air pipes, Fuel pipes and Duct pipes

 

The company has been fully engaged in complicated and sensitive projects  in the field

© 2019 by Ajim Enterprises.                                                                                                                                       Created by Chris Zacharia